My Productivity Calc

Home · Guides · Productivity basics

How to recover a bad productivity week without staying late every night

Work out what the rest of the week requires before you decide to skip lunch.

To recover a bad productivity week, first work out the percentage you need on each remaining day. If your employer averages productivity across the week, start with that one number. It tells you whether the week needs a few harder days or an early conversation with your manager.

Take an example Monday. Two patients decline, one is off the unit for imaging, and an evaluation runs 40 minutes over. You finish at 61% against an 85% target. Before you plan extra patients, skipped breaks or late finishes, run the sum below.

The calculation to recover a bad productivity week

The question is what each remaining day needs so that the whole week lands on target.

Needed each remaining day = (target × total days − average so far × days worked) ÷ days left

Target times total days is the week's budget. Your average so far times the days worked is what you have banked. What is left, divided by the days left, is what each remaining day needs.

Take a different week from that Monday: an 85% target, a five-day week, and two days done at an average of 74%.

  • Budget for the week: 85 × 5 = 425
  • Banked so far: 74 × 2 = 148
  • Left to find: 425 − 148 = 277, across three days
  • Needed each remaining day: 277 ÷ 3 = 92.3%

That is 7.3 points above target on each of the three days. On a 450-minute paid day, 92.3% is 416 treatment minutes, against the 383 a target day needs. The gap is about 33 minutes a day, which is one filled gap or one extra short session.

The weekly productivity calculator does this sum and shows the answer in percent and in treatment minutes. It also gives one of four verdicts.

VerdictWhat it meansExample (85% target, 5-day week, 2 days done)
On trackThe days left need your target or lessAverage 86% so far: 84.3% needed
RecoverableUp to 5 points above target each dayAverage 80% so far: 88.3% needed
Steep, but possibleMore than 5 points above target, up to 100%Average 74% so far: 92.3% needed
Not reachableMore than 100% each dayAverage 40% so far: 115% needed

So the 74% example is steep, but possible. It asks for a harder three days, and it can be done.

When to stop trying

Now run the same sum on a much worse start, two days at 40%.

  • Banked: 40 × 2 = 80
  • Left to find: 425 − 80 = 345, across three days
  • Needed each remaining day: 345 ÷ 3 = 115%

You can't treat for more than 100% of your paid time, so the week can't reach target. The best possible outcome is three days at 100%, which closes the week at (80 + 300) ÷ 5 = 76%.

The two situations call for different behavior. The 74% start calls for a harder week. The 40% start calls for a conversation on Wednesday morning, before your review rather than at it. On Wednesday a rehab director can still move a patient onto your schedule or move an evaluation off it. The following Monday they can only record the number.

What moves your weekly productivity

If the week is recoverable, these are the changes that move the number.

Fill the gaps you already have. A cancelled 2pm slot filled with a patient adds treatment minutes without adding paid minutes. Staying an extra hour adds to both, so it moves the percentage less.

Ask for a schedule change. "Can I take an extra patient Thursday?" is an easier request than "Can my target be adjusted?" It is also the one that changes the arithmetic.

Treat moving documentation off the clock as a last resort. Writing notes at home raises your productivity percentage only if the freed minutes become treatment or your paid day gets shorter. It also means working unpaid. In the US, work an employer suffers or permits counts as hours worked under the federal wage rules, even when nobody asked for it. Read unpaid documentation time and what documentation costs you before you decide it is normal.

Don't double-book to fix a percentage. Concurrent and group therapy have their own definitions and limits. For US Medicare Part A stays in skilled nursing facilities (PDPM), group and concurrent therapy together are limited to 25% per discipline. The rules are set out in the guide to group and concurrent therapy under PDPM.

The trap of the daily target

Some employers measure each day on its own, with no averaging. On that system none of the above applies, because a low day can't be offset by higher days later in the week.

Find out which system you are on. Under a weekly average, a difficult day is a math problem you can solve on Tuesday. Under a daily target, every day is final, and the pull to save each one at any cost is much stronger. If your department measures daily, you can ask whether a weekly average would be considered.

The pay-period version

Some employers average across a two-week pay period instead of a week. The formula is the same, with ten days instead of five, so each day is one tenth of the result instead of one fifth.

Example: an 85% target across ten days, with three days done at an average of 70%.

  • Budget: 85 × 10 = 850
  • Banked: 70 × 3 = 210
  • Needed each remaining day: (850 − 210) ÷ 7 = 640 ÷ 7 = 91.4%

That shortfall is bigger than the five-day example's. Three days at 15 points below target is 45 points to make up, against 22 points (two days at 11 below) in the five-day week. Because seven days share it, each needs 91.4%, a little less than the 92.3% the five-day week asked for. Over a pay period, the five-day example's two days at 74% would need only 87.8% on each of the remaining eight days. The sum is (850 − 148) ÷ 8 = 87.75.

Check which period your employer uses before you decide how hard to push. If you are measured over a pay period, a bad first week still has the second week to recover. Days of different lengths and leave change the sum, as the guide to weekly and pay-period averages shows.

What a bad week means for the schedule

A clinician running 15 points below target for a week is a scheduling signal for the department. On a 450-minute paid day, 15 points is 67.5 minutes. With 45-minute sessions, that is one and a half sessions a day.

Put that way, the conversation opens with "I have about a session and a half of unfilled time a day this week. Can we look at the schedule?" That question invites a practical fix, where "I am behind on my numbers" invites a performance discussion. For that conversation, see the guide to what to say in supervision when your productivity is below target.

Work out your own numbers

The home calculator works out your day, the rest of your week and what documentation costs you. Free, no signup, nothing uploaded.

Open the calculator

Related guides